Interstate 25 Corridor Study
The New Mexico Department of Transportation (NMDOT) and the Federal Highway Administration (FHWA), with significant input from the public and stakeholder agencies, completed a corridor study for the Interstate 25 (I-25) corrdior through Santa Fe. The purpose of the study was to provide recommendations for the regional transportation network and for improvements to I-25 between the Santa Fe Relief Route (NM599) and Old Pecos Trail (NM466) to meet existing and future travel demands on this section of I-25
Phase B Report
The Finalized Phase B Report is available for download below:
Finalized Phase B Report [11.3MB in Size]
Appendix A [8.0MB in Size]
Appendix B [0.5MB in Size]
Appendix C [1.8MB in Size]
Appendix D [1.4MB in Size]
Appendix E [0.6MB in Size]
Hard Copies of the Report are also available for review at the three City Libraries:
Main Library – 145 Washington Ave
La Farge Library – 1730 Llano St.
Southside library – 6599 Jaguar Dr.
Phase B Recommendations Presentation [25MB in Size] – Distributed at the January 25th Technical Coordinating Committee Meeting.
Phase A Report
The Finalized Phase A Report is available electronically for review HERE.
Hard Copies of the Report are also available for review at the three City Libraries:
Main Library – 145 Washington Ave
La Farge Library – 1730 Llano St.
Southside library – 6599 Jaguar Dr.
Public Information Meetings
The final Public Information Meeting for this study was held on Thursday December 3, 2009 at the Genoveva Chavez Community Center. At that meeting the results of the analysis completed as part of Phase B of the Study and the recommendations were presented.
Meeting Presentation [8.3MB in Size]
Meeting Handout [0.7MB in Size]
Public Comment (Updated 12/17/09)
If you would like to submit comments on this Study you can do so by emailing Eric Johnson at eric@marroninc.com or in writting to Eric Johnson, Marron & Associates, 7511 Fourth Street NW, Albuqureque, NM 87107.
A Public Information Meeting was held on Thursday August 20th in the Genoveva Chavez Community Center.
Meeting Presentation [1.6MB in Size]
Public Comment (Updated 10/16/09)
For more information on this Study, contact Ross Lujan with CH2M Hill at Ross.Lujan@ch2m.com or (505) 855-5236, or David Quintana with the New Mexico Department of Transportation at david.quintana@state.nm.us or (505) 827-1635 or visit the NMDOT I-25 Webpage.
Study Status with the MPO
The Recommendations from this Study are being used in the development of the Update to the Metropolitan Transportation Plan (MTP). Click HERE for more details on this process.
Page Last Updated – March 18th, 2010

**********************************